The sewer department is overseen by the Superintendent, Mr. Leslie McMullen. This department’s primary responsibility is the day-to-day operations of the Waste Water Treatment Plant (WWTP). The Borough’s WWTP has a designed daily flow of 1.85 MGD, with a peak flow of 3.70 MGD. The Plant, constructed in 1941, underwent major reconstructions in the 1960’s, and then again in 1994. The 1994 project came at a cost of $3.7 million, and provided long-lasting overhauls and rehabilitation to the system.
The Department also provides ongoing maintenance and replacement of all sanitary pipes and infrastructure, including pumping stations, throughout the Borough and Manor Township.